BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Whitehall, Montana. Completed plans call for the renovation of a educational facility.

The work consists of removing and disposing of existing windows and installing 171 new windows campus wide to include 27 windows (slider style) in elementary school, 40 windows (32 slider style, 8 casement style) in the middle school, 104 windows in the high school (52 fixed pane and 52 awning style). Work is expected to be completed during the months of June, July, and August of 2022 and/or 2023 and/or on weekends during the 2022-2023 school year to minimize disruptions to students. Bids must include anticipated project commencement date and anticipated project timeline. The district is willing to take delivery of and store project materials until installation can occur. A bidder Q and A session will be held at 11:00 a.m. (Mountain Time), December 28, 2021, at 1 Yellowstone Trail, Whitehall, MT 59759. No bidder may withdraw his bid for at least thirty (30) days after the scheduled time of bid receipt. Bids must be accompanied by a bidder's bond equal to ten percent (10%) of the total bid, as defined by state law. The successful bidder will furnish an approved Performance Bond and Labor and Material Payment Bond in the amount of one hundred percent (100%) of the contract. The Contractor shall comply with all fair labor practices and must meet the requirements of all local, state, and federal statutes include prevailing wage and hiring preferences. Each bidder and Contractor is required to have a current and valid Montana Contractor's Registration and Montana Contractor's License, as applicable, in the proper classification for the work bid, and such registration and license must remain valid throughout the period of the contract. Whitehall Public Schools reserves the right to reject any and/or all bids, to waive any and/or all informalities or technicalities, and to act in the best interest of the Whitehall Public Schools.

Post-Bid

Educational

$200,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
3
Bidding Soon
71
All Active Projects
33
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2022

February 4, 2022

img_map_placeholder

Multiple Locations, Whitehall, MT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.