Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 27, 2023 at 8:00 PM
Updated January 26, 2024
Site work and new construction of a mixed-use development in Reno, Nevada. Completed plans call for site work for a educational facility; and for the construction of a 125,000-square-foot educational facility.
Construction started in July 2023. The building is expected to be complete in July 2025 and fully operational for the Fall 2025 semester. Connection, revitalization and an inspiring corridor to campus — the University’s Gateway project is about more than beautiful new buildings; it’s about bridging the community together. The new College of Business The five-story, 128,000 square-foot building will become a new home for the College of Business. The full block development includes site and landscape improvements to promote a variety of flexible and functional outdoor spaces. The building will have multiple points of entry, at both Level 1 and Level 2, that will enhance programmatic adjacencies between internal programs and external context, encouraging spontaneous collaboration and active learning. It will enhance student success by providing learning spaces modeled on up-to-date best practices in business pedagogy and instruction. Planned features also include the following: A 300-seat auditorium, a café/social space, advanced technology labs, state-of-the-art trading lab, case-method optimized teaching and study spaces, team meeting spaces and collaboration zones and study niches and collaboration zones. The Gateway parking project: The Gateway Parking Complex opened in January 2023 and is an infrastructure anchor for the Mathewson University Gateway. The seven-story complex is located on the southwest corner of Lake and East Ninth Streets and includes 800 parking spaces for use by University students, faculty, staff and visitors as well as a pedestrian bridge on the north end of the garage, allowing people to safely cross Ninth Street onto the University campus. *This project has been updated to Award status based on historical confirmations and outreach. Recent inquiries have gone unreturned. If you have any current information on this project, please notify our editorial staff at contentcase@constructconnect.com.
Under Construction
Library
$2,000,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 5, 2023
1664 N Virginia St, Reno, NV
Related To This Project
Reno, NV
Bid Date: Mar 20 2023
Reno, NV
Bid Date: Sep 22 2021
Reno, NV
Bid Date: Oct 13 2021
Reno, NV
Bid Date: Sep 30 2021
Reno, NV
Bid Date: Feb 01 2022
Reno, NV
Bid Date: Sep 15 2021
Reno, NV
Bid Date: Mar 08 2023
Reno, NV
Bid Date: Feb 23 2023
Reno, NV
Bid Date: Apr 11 2023
Reno, NV
Bid Date: Feb 21 2023
Reno, NV
Bid Date: Mar 08 2023
Reno, NV
Bid Date: Mar 09 2023
Reno, NV
Bid Date: Mar 02 2023
Reno, NV
Bid Date: Feb 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
