Renovation of a water / sewer project in Barkhamsted, Connecticut. Completed plans call for the renovation of a water / sewer project.

Contract Award Date: Oct 21, 2022 Contract Award Number: W912WJ23P0001 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: GMGZEQDN6AS9 Contractor Awarded Name: LANTERRA, L.L.C. Contractor Awarded Address: Houston, TX 77035-6517 USA Base and All Options Value (Total Contract Value): $144000.00 THE WORK CONSISTS OF: Colebrook Lake Dam is a dam located in the town of Colebrook in northwestern Connecticut. This dam is operated in conjunction with other Corps reservoirs in the Connecticut River basin to reduce flood levels on the main stem of the Connecticut River. The existing gate chamber (approximate floor elevation 583) currently only receives mechanical heating indirectly through the ventilation fan system located in the furnace room (approximate floor elevation 777). The ventilation fan system retrieves its supply air from the room temperature air in the furnace room and delivers to the gate chamber. The existing ventilation system appears to have sufficient supply and velocities of air reaching the gate chamber; however, the supply diffuser serving the furnace room is located in the upper 1/3 of the room volume whereas the supply air ventilation fan is located near the floor. Additionally, the supply diffusers for the ventilation system at the gate chamber room are located 8-9 feet above the finished floor. Therefore, it is assumed that much of the heated air reaching the gate chamber is not reaching the lower level of the gate chamber. The work to be included in in this contract is as follows: Replace the existing heating system at the Colebrook River Lake Gatehouse Tower in order to eliminate the high humidity and lowered space temperature issues within the gate chamber. For reference, the existing service bridge to the gatehouse tower is approximately 10-feet wide with a current load rating of HS-20: Inventory 22T, Operating 36T. The doorway opening at the operating room floor is approximately 7.33-feet. There is also an onsite 5-ton monorail hoist located in the operating room that will be available for use; however, the Contractor shall be required to provide an annual inspection certificate and conduct operational testing in accordance with EM 385-1-1, Section 16, prior to use. Work on this project is anticipated to involve fall safety hazards. If work is completed at heights, the Contractor is responsible for establishing and implementing a fall protection program in accordance with EM 385-1-1, Section 21. This includes the development of site-specific Fall Protection and Prevention Plan with onsite oversight by a Competent Person who has successfully completed a 24-Hour Competent Person in Fall Protection Training. The gate chamber is considered a Non-Permit Required Confined Space. If work execution in the gate chamber creates an atmospheric hazard, the gate chamber will be reclassified as a Permit-Required Confined Space. Any work conducted in a Permit Required Confined Space must be completed in accordance with EM 385-1-1, Section 34 and will require a site-specific Confined Space Entry Plan. Vendors should note that interruption of the existing heating system or removal of any components that result in the non-operability of the existing heating system will not be permitted until the new components are on the project site and ready for installation The magnitude of construction is between $100,000 and $250,000. This procurement is set-aside for small business vendors. The applicable NAICS code is 238220 with a Small Business Size Standard of $16.5 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY OFFEROR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE. Please Direct Questions to Jennifer M. Samela at (978) 318-8324 or Jennifer.m.samela@usace.army.mil. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$144,000.00

Public - Federal

Renovation

13

10

4

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
290
Active Projects
148
Bidding Soon
2,871
All Active Projects
1,245
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2022

October 28, 2022

img_map_placeholder

To Be Determined, Barkhamsted, CT


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.