BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to an educational facility in Afton, Tennessee. Completed plans call for the addition of a 16,055-square-foot educational facility; for the demolition of a educational facility; and for site work for a educational facility.

The project consists of the addition to Chuckey Doak Middle School, approximately 16,055 square feet. The new construction will be cmu, brick, bar joist,EPDM roof system, and concrete slab. Pertinent interior finishes including, doors, cmu partitions, flooring, mechanical and electrical systems. All disciplines must utilize the attached Davis-Bacon WageRates. Bid Packages Foundation Steel (rebar) Concrete (Owner to supply concrete product) Plumbing Electrical (Davis-Bacon Wage Rates not to be included in this discipline) Sprinkler - Exterior Any/all debris will be disposed ofat the Greene County Landfill. (NO SUBSTITUTIONS WILL BE ALLOWED). It is the responsibility of all interested contractors to visually inspect the conditions andconstraints associated with the Scope of Work. A Performance and Payment Bond will be required for this Work. Successful bidders will be required to submit background data on all personal performing work on Greene County School property. Owner reserves the right to waive any formalities or to reject any and all bids.

Post-Bid

Educational

$700,000.00

Public - County

Addition, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
21
Bidding Soon
483
All Active Projects
221
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2023

June 6, 2023

img_map_placeholder

120 Chuckey Doak Rd, Afton, TN

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.