Published March 8, 2022 at 7:00 PM
Updated November 15, 2023
Renovation of an educational facility in Elnora, Indiana. Completed plans call for the renovation of a educational facility.
**As of March 8, 2022 this project was awarded to Santarossa Mosaic and Tile. Awarded amount not established. All work for the complete construction of the Project will be under one Prime Contract with the Owner based on proposals received and awarded. All proposals shall include a price for the complete turnkey installation. The Contractor shall field verify all existing conditions and coordinate his work prior to submitting the proposal. o New Epoxy terrazzo floor finish in existing cafeteria and at south door opening into Kitchen as indicated herein. o Contractor shall provide all labor and materials required to install new epoxy terrazzo floor finish in cafeteria and at adjacent south entrance into Kitchen. Contractor shall purchase and install wall base. In addition, the Contractor is to provide all coordination with the Owner and Owner's Representative for conducting work, providing for safety around and to the work site, minimizing and repairing any damage or impact to existing building materials or systems due to construction activities at no cost to the Owner. Contractor is allowed to utilize the Owner's electricity, water, and sanitary facilities as necessary to carry out the project scope of work, and as coordinated with the Owner's Representative. Contractor is responsible for all costs to hire a qualified electrician to connect equipment power supply to Owner's existing electrical panels. Construction Trailers if necessary or storage containers/fenced-in lay-down space for construction materials is the responsibility of the Contractor and is to be coordinated with the Owner's Representative, and any damage to exterior site conditions must be restored to original condition at the end of the project at no cost to the Owner. Project Location: North Daviess Jr./Sr. High School, 5494 East State Road 58, Elnora, Indiana 47529 o On-Site Start Construction: June 1, 2022. o Project Complete: August 1, 2022 NO EXCEPTIONS
Award
Educational
$200,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.