BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Bartow, Florida. Contact the soliciting agency for additional information.

As of April 18, 2022, a consultant has been selected. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 01 Selection Method : Letter of Response and Interview Professional Liability Insurance : $300,000.00 TRC Members (Subject to Change) : Amy Blair Jennifer McKinney Sean Pugh Project Manager : Amy Blair Number of contracts that may be awarded from this advertisement : 3 Standard Note 8 - Under-Utilization Goal for DBEs and Small Businesses - The goal of the Department's Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. The specific Under-Utilized Work Groups are identified in the advertisement. Consultants are strongly encouraged to propose a DBE or Small Business to perform services for each Under-Utilized Work Group identified in the advertisement. DBEs or Small Businesses can be proposed at either the Prime or Sub-level for the Under-Utilized Work Group(s). Use of Under-Utilized DBEs or Small Businesses for Consultant teaming is a shortlist consideration factor for projects referencing this Standard Note. Financial Management Number(s) 198395 2 32 01 Longlist Date/Time 1/21/2022 12:00 am Shortlist Selection Date/Time 1/25/2022 08:00 pm Phase II Submittal Deadline Date/Time 2/08/2022 01:30 am Consultant Interviews Date/Time 2/08/2022 Technical Review Committee Meeting 1 Date/Time 2/10/2022 09:45 am Final Selection Date/Time 2/22/2022 08:00 pm Negotiations Period Begin Date 3/02/2022 Negotiations Period Ending Date 4/01/2022 The method of contractor selection has not been determined at this time. FDOT -RFP Engineering - Resurfacing Design - Continuing Services Contract

Conceptual

Roads / Highways

$5,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
64
Bidding Soon
1,399
All Active Projects
559
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.