Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, new construction and renovation of a mixed-use development in Hayward, California. Conceptual plans call for the construction of a 25,000-square-foot, two-story above grade educational facility; for the renovation of a educational facility; for site work for a educational facility; 4,500-square-foot, one-story above grade fire / police facility; and fire / police facility.
This project will address the seismic issues associated with the existing Library building (#12), a two-story, square-shape concrete building built in 1971, which carries the highest level of seismic risk in the CSU system. The project will construct/renovate approximately 25,000 ASF/37,000 GSF of relocation space to accommodate instructional, administrative, and academic support spaces that will be displaced by the decommissioning of the west wing of the existing Library building. A new 4,500 ASF/7,000 GSF one-story stand-alone facility (#19) will be constructed for the University Police Department, which will be equipped with an emergency power supply to ensure continued operations, specially in the event of a disaster. This project is currently in the California State University's FY 2024-2025 CIP. As of December 8, 2023, this project is priority number 4 on the owner 2024/2025 Capital Outlay Program Project List. At this time, it is not known if funding has been received for this project. Information regarding a design team or a general contractor is not available. A timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Educational
$28,609,000.00
Public - State/Provincial
New Construction, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 9, 2024
25800 Carlos Bee Blvd, Hayward, CA
Related To This Project
Hayward, CA
Bid Date: Feb 15 2022
Hayward, CA
Bid Date: Apr 08 2022
Hayward, CA
Bid Date: Apr 07 2022
Hayward, CA
Bid Date: Jun 21 2022
Hayward, CA
Bid Date: May 31 2022
Hayward, CA
--
Hayward, CA
Bid Date: Mar 29 2022
Hayward, CA
Bid Date: Apr 05 2022
Hayward, CA
Bid Date: Apr 06 2022
Hayward, CA
Bid Date: Mar 22 2022
Hayward, CA
Bid Date: Sep 26 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.