BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in Elk Grove, California. Completed plans call for the renovation of a educational facility.

As of April 5, 2022 This project is already awarded to KS Telecom with the awarded amount of $801,500.98. The Elk Grove Unified School District ("District") is requesting a proposal (RFP) from Contractors holding a Class C-7 license, for the E-rate Infrastructure Hardware and Installation project at fourteen (14) school sites. MDF 1) Inventory all network equipment and document all serial numbers and asset tag to location. 2) Assemble rack mount hardware 3) Upgrade network equipment firmware to current production firmware (coordinate/confirm with District Technology Services Network Team). 4) Configure network equipment according to district standard configuration. 5) Install network equipment into assign locations and interconnect WAN, backbone to all IDFs and patch in all terminated data drops. 6) Label network equipment on right hand side using 6mm Black-on-White TZ tape. Label switches as follows: a) Router = Abbreviated Site - Core (FHS-Core = Florin High School-Core) b) MDF Switch = Abbreviated Site - MDF - SW## (i.e. FHS-MDF-SW1 = Florin High School-MDF-Switch#1) c) IDF Switch = Abbreviated Site - IDF## - SW## (i.e. FHS-IDF00-SW2 = Florin High School-IDF00-Switch#2) 7) Test and verify every VLAN on each switch by making sure the test device can receive an IP address and the test device can ping the following: a) Itself b) Default Gateway c) 10.10.10.1 8) After all networks on the switch have been validated, secure the MDF. IDF 9) Inventory all network equipment and document all serial numbers and asset tag to location. 10) Assemble rack mount hardware 11) Upgrade network equipment firmware to current production firmware (coordinate with District Technology Services Network Team). 12) Configure switches according to district standard configuration. 13) Install switches into assign locations and interconnect backbone to MDF and patch in all terminated data drops. 14) Label network equipment on right hand side using 6mm Black-on-White TZ tape. Label switches as follows: a) Abbreviated Site - IDF## - SW## (i.e. FHS-IDF00-SW2 = Florin High School-IDF00-Switch#2) 15) Test and verify every VLAN on each switch by making sure the test device can receive an IP address and the test device can ping the following: a) Itself b) Default Gateway c) 10.10.10.1 16) After all networks on the switch have been validated, secure the MDF/IDF. The Administration reserves the right to accept or reject any and all SOQ/P, to negotiate with any and all-responsible firms, and to waive any informality in the process. The District is not responsible for any expenses related to the preparation or presentation of the RFP, including travel costs In order to control information disseminated regarding this RFP, firms interested in submitting RFP are directed not to make personal contact with members of the Governing Board or District Administration with the exception of the individual, or department staff listed on the RFP packet. This includes unauthorized visits to District-educating facilities. In accordance with California Labor Code Section 1770 et seq. payment of the appropriate general prevailing rate of wages for all crafts employed on the public works site is required of the Contractor and all subcontractors. Compliance with California Education Code Section 45125.1 mandating fingerprinting requirements applies to this project. Location- Robert L. Trigg Education Center, Boardroom 9510 Elk Grove-Florin Road Elk Grove, CA 95624 Laguna Creek High School - 9050 Vicino Dr, Elk Grove, CA 95758 Barbara Comstock Morse Elementary School - 7000 Cranleigh Ave, Sacramento, CA 95823 John Reith Elementary School - 8401 Valley Lark Dr, Sacramento, CA 95823 Prairie Elementary School - 5251 Valley Hi Dr, Sacramento, CA 95823 Samuel Jackman Middle School - 7925 Kentwal Dr, Sacramento, CA 95823 Herman Leimbach Elementary School - 8101 Grandstaff Dr, Sacramento, CA 95823 James Rutter Middle School - 7350 Palmer House Dr, Sacramento, CA 95828 David Reese Elementary School - 7600 Lindale Dr, Sacramento, CA 95828 Florin Elementary School - 7300 Kara Dr, Sacramento, CA 95828 Samuel Kennedy Elementary School - 7037 Briggs Dr, Sacramento, CA 95828 Anna Kirchgater Elementary School -8141 Stevenson Ave, Sacramento, CA 95828 Isabelle Jackson Elementary - 8351 Cutler Way, Sacramento, CA 95828 Sheldon High School - 8333 Kingsbridge Dr, Sacramento, CA 95829 Mary Tsukamoto Elementary School - 8737 Brittany Park Dr, Sacramento, CA 95828

Award

Educational

$801,501.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
87
Bidding Soon
1,699
All Active Projects
712
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2022

March 14, 2022

img_map_placeholder

Multiple Locations, Elk Grove, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.