Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 11, 2022 at 7:00 PM
Updated November 15, 2023
Site work for a municipal facility in Morrow, Georgia. Working plans call for site work for a municipal facility.
Separate sealed Bids for the construction of CCWA HEADQUARTERS SITE RECONFIGURATION will be received by the Clayton County Water Authority (CCWA) CONSTRUCTION SERVICES, GENERAL, INCLUDING MAINTENANCE AND REPAIR SERVICES) The last addendum will be issued no later than January 25, 2022, at 2:00 p.m. The Project includes, but is not limited to, the following upgrades to the existing Clayton County Water Authority (CCWA) Headquarters Site located at 1600 Battle Creek Road, Morrow GA: A. Reconfiguration of the visitor parking lot and drive including drop off lane for conference room, installation of new pervious paver parking spaces, ADA Handicap spaces and ramp with handrails, and two (2) decorative retaining walls less than 5 feet tall. B. Enlarging the existing storm water management facility located between the employee parking and the secure storage yard and enhancing existing swales along employee parking to provide water quality and detention for the CCWA campus. C. Installing/relocating black chain link boundary fence, installing swing gates/slide gates at employee entrances including lower storage yard drive entrance and at the internal secured storage yard entrances. This item includes the necessary electric components to ensure secure entry for: 1. Employee parking - 2 swing gates, card entry, auto exit detection. 2. Lower storage yard - 1 swing gate, card entry, auto exit detection. 3. Secure storage yard - 1 sliding gate, 1 swing gate, card entry, auto exit detection. 4. Provide all necessary components and ensure all components are compatible with existing security software system. D. Provide a service line for dewatering container with a water proof quick connect. E. Install new storm outfall line (42-inch RCP) F. Mill, pave, and stripe employee parking, add landscape islands and striping per plans G. Relocate/Install internal security light poles with customer and employee parking lot and secure storage area, and relocate bulk storage. H. Demolition and removal of existing asphalt, concrete, curb and gutter, and vegetation and storm pipes.
Final Planning
Municipal
$250,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
