BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2022 at 7:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Brandon, Mississippi. Completed plans call for site work for a water / sewer project.

**As of March 3, 2022, Project has been awarded. Award amount is $327,368.40** Bid Number 2022-01 Project includes but is not limited to the installation of approximately 5700' of 10" water line and 1700' of 2.5" sanitary sewer force main pipe and all other associated work Bid Security in the amount of 5% of the bid must accompany each bid in accordance with the INTRUCTIONS TO BIDDERS. Attorneys-in-fact who sign Bid Bonds, Payment Bonds or Performance Bonds must file with each bond a certified and effective dated copy of their Power of Attorney. No prospective CONTRACTOR may withdraw his proposal within SIXTY (60) DAYS after the actual date of the opening thereof. Each bidder shall write the Certificate of Responsibility number and Mississippi Contractors License number on the outside of the sealed envelope containing his proposal. Proposals shall be submitted in duplicate, sealed and deposited with the City Clerk prior to the hour and date designated above. Bid Number 2022-01 should be marked in the lower left corner of the envelope. All documents may be downloaded from Central Bidding at. For any questions relating to the electronic process, please call Central Bidding at (225)810-4814. The Contract Time is One Hundred Twenty (120) consecutive calendar days with liquidated damages being One Thousand Dollars ($1,000) per calendar day thereafter. The CITY OF BRANDON reserves the right to waive any information or irregularities, to accept any bid deemed to be in the best interest of the City, or to reject any or all bids. The Contractor shall furnish all labor, materials, equipment, tools, services and incidentals to complete all work required by these Specifications and as shown on the Drawings. B. The Contractor shall perform the work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, cleanup, replacements and restoration, including restoration of vegetative cover required as a result of damages caused during this construction. C. All materials, equipment, skills, tools and labor which are reasonably and properly inferable and necessary for the proper completion of the work in a substantial manner and in compliance with the requirements stated or implied by these Specifications or Drawings shall be furnished and installed by the Contractor without additional compensation, whether specifically indicated in the Contract Documents or not. D. The Contractor shall comply with all county, city, state, federal, and other codes which are applicable to the proposed constructions work

Award

Water / Sewer

$327,368.00

Public - City

Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
34
Bidding Soon
396
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2022

February 21, 2022

Project location map

Multiple Locations, Brandon, MS


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.