BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Belmont, Mississippi. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Bid Guarantee: Proposals shall be submitted with Proposal Security in the form of Certified Check or acceptable Bid Bond in an amount equal to at least five percent (5%) of the base bid; such security is to be forfeited as liquidated damages, not penalty, by any bidder who fails to carry out the terms of the proposal. The Bid Bond, if used, shall be payable to the Owner. Bonds on the project must be received on or before the period scheduled for the project and no bid may be withdrawn after the scheduled closing time for the project. Bids must be firm for a period of forty-five (45) days after the scheduled time of opening. Performance-payment Bond: A one hundred percent (100%) Performance-Payment Bond issued by a surety company authorized to do business in the State of Mississippi will be required within ten (10) days after the successful bidder has been notified of the award of the contract to him. Certificate of Responsibility: All bids submitted by a prime or subcontractor for public works or public projects where said bid is in excess of fifty thousand dollars ($50,000.00) to perform contracts enumerated in Section 31-3-21, Mississippi Code of 1972, shall contain on the outside or exterior of the envelope or container of such bid the contractor's current certificate number. No bid shall be opened or considered unless such contractor's current certificate number appears on the outside or exterior of said envelope or container or unless there appears a statement on the outside or exterior of such envelope or container to the effect that the bid enclosed therewith does not exceed fifty thousand dollars ($50,000.00). NOTE: When bids are submitted electronically, the requirement for including on the exterior of the bid envelope the contractor's current certificate of responsibility number or a statement that the bid enclosed does not exceed fifty thousand dollars ($50,000.00) shall be deemed fulfilled and the bid in compliance by including the same information as an attachment with the electronic bid submittal. The Owner reserves the right to reject any or all bids and to waive irregularities. LIQUIDATED DAMAGES: The Owner will deduct $150.00 per day liquidated damages for each day of delay exceeding the contract time until such time substantial completion is reached.

Post-Bid

Educational

$2,432,287.00

Public - County

New Construction, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
15
Bidding Soon
242
All Active Projects
112
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2021

April 18, 2022

img_map_placeholder

9 School Dr, Belmont, MS


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.