Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 26, 2023 at 7:00 PM

Updated January 27, 2024

Site work and paving for a transportation facility in Keene, New Hampshire. Conceptual plans call for site work for a transportation facility; and for paving for a transportation facility.

The City reserves the right, through the City Manager, to accept and reject any or all statements and to waive any defect when in the best interest of the City. The City of Keene owns and operates the Dillant-Hopkins Airport, a non-towered General Aviation airfield located in the Town of Swanzey, New Hampshire. The airport facilities include a primary Runway (2-20) and a crosswind Runway (14-32) along with associated taxiways and multiple paved aircraft aprons, a terminal building that accommodates a Fixed Base Operator facility, a separate SRE/maintenance facility, and multiple aircraft storage hangars. The airport also features an Instrument Landing System (ILS) to Runway 02. Both 100 low-lead aviation gasoline and Jet A fuels are available at the airport.

Conceptual

Transportation Terminals

$100,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
766
Active Projects
365
Bidding Soon
4,996
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2025

Project location map

80 Airport Rd, Keene, NH


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed