BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 29, 2021 at 7:00 PM

Updated January 29, 2024

Site work and paving for a mixed-use development in Argos, Indiana. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Town of Argos - Marshall Street, Walnut Street, and Michigan Street (Des 2101288) in La Porte District This Request for Proposals (RFP) is official notification of needed professional services. This RFP is being issued to solicit a letter of Interest (LOI) and other documents from firms qualified to perform engineering work on federal aid projects. A submittal does not guarantee the firm will be contracted to perform any services but only serves notice the firm desires to be considered. Contact for Questions: Doug Middleton, Assistant Superintendent 201 W Walnut Street Argos, IN 46501 (574) 892-5717 dmiddleton@townofargos.com Project Location: Marshall Street, Walnut Street, and Michigan Street Project Description: This project is for the construction of new sidewalks and trail. The first is new 5 wide concrete sidewalk along the north side of Marshall Street from Freedom Street to the entrance to the Colonial Court Mobile Home Park. There is a proposed crossing at the entrance to the Community Park, which will connect this new sidewalk into existing sidewalk on the south side of Marshall Street. Additional new 5 wide concrete sidewalk will be built from the terminus of existing sidewalk to Michigan Street, and north on the west side of N Michigan street to the town limits. New 8 wide asphalt trail will be constructed on the east side of N Michigan Street from Marshall Street to the northern town limits. There will be construction of new 5 wide concrete sidewalk on the south side of Walnut Street from Pond Street and the north side of Walnut Street to Clinton Street. The 8 wide asphalt trail will be along the west side of Pond Street from Woodland Trail to the entrance of Pond Park. This trail will be connected to the trail along SR 10 by a sharrow along Woodland Trail, making the low residential street available for thru bicycle traffic. Phases Included: Preliminary Engineering (PE), Right of Way (RW) Funding: Federal (Transportation Alternative) and Local Match Term of Contract: Until Project Completion The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - Marshall Street, Walnut Street, and Michigan Street

Conceptual

Roads / Highways

$680,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
1
Bidding Soon
952
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2023

Project location map

Multiple Locations, Argos, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.