Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Wentzville, Missouri. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
As of January 27, 2023, a design team has been identified. A construction timeline has not been established yet. *The previous solicitation is listed below for reference. The City of Wentzville ("City") is seeking a consultant ("Firm") for professional services to design the Route Z Widening and Signalization ("Project"). The design will be managed by the City of Wentzville, in accordance to MoDOT LPA Program guidelines. DBE participation for this project will be required with a DBE goal set at 12%. The Project proposes to widen Route Z to a 4-lane facility south of Interstate Drive to Perry Cate Boulevard with dedicated left-turn and right-turn lanes at key side streets. Associated with this widening is also the superstructure replacement widening of the bridge over Peruque Creek (A2314) to accommodate the 4-lane cross-section and the extension of a multi-use trail. In addition to the pavement widening, the existing 3-foot paved shoulders would be replaced with 6-foot-wide shoulders. In addition to the pavement and bridge widening this project proposes to add a traffic signal at the intersection of Route Z and Peruque Hills Parkway/ Peruque Ridge Boulevard. This intersection currently meets traffic volume warrants based on an 8-hour signal warrant analysis completed by MoDOT in March 2017. Fiber interconnect is also proposed to connect the existing signals at Route Z and Interstate Drive and Perry Cate as well as the proposed signal at Route Z and Peruque Hills Parkway/ Peruque Ridge Boulevard. All roadway design components shall meet current AASHTO, MoDOT, and City of Wentzville design standards. Specific services will include, but are not limited to, Agency coordination, geotechnical engineering, survey, utility coordination/relocation and design, environmental work and permitting. The total design/construction budgetary goal is $10,500,000. This includes environmental studies, survey, geotechnical investigation, roadway, bridge, storm water quality and detention design, traffic control, erosion control, utility relocation, permanent utility easement documents, temporary construction easement documents, right of way documents, plans, specifications, and estimate (PS&E) for Agency approvals and permits, bidding, construction, construction engineering, construction inspection, and other miscellaneous costs. All questions are to be submitted through the E-bidding system by January 14, 2022 The City reserves the right to reject any or all SOQ's, or portions thereof, to waive technicalities or deficiencies in any or all the SOQ'S. The City of Wentzville reserves the right to cancel this Request for SOQ's in part or in its entirety. This Request for SOQ's does not commit the City of Wentzville to award a contract or to pay any costs to Firms in preparation of their SOQ. The method of contractor selection has not been determined at this time. MODOT - RFQ Engineering - Route Z Widening and Signalization
Design
Bridges / Tunnels
$10,500,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2023
Hwy Z, Wentzville, MO
Related To This Project
Wentzville, MO
Bid Date: Feb 22 2023
Wentzville, MO
Bid Date: Feb 06 2023
Wentzville, MO
Bid Date: Mar 07 2023
Wentzville, MO
Bid Date: Mar 02 2023
Wentzville, MO
Bid Date: Mar 03 2023
Wentzville, MO
Bid Date: Mar 24 2023
Wentzville, MO
Bid Date: Mar 06 2023
Wentzville, MO
Bid Date: Mar 01 2023
Wentzville, MO
--
Wentzville, MO
Bid Date: Jan 30 2023
Wentzville, MO
Bid Date: Feb 17 2023
Wentzville, MO
Bid Date: Feb 17 2023
Wentzville, MO
Bid Date: Feb 16 2023
Wentzville, MO
Bid Date: Feb 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.