Site work for a water / sewer project in Lexington, South Carolina. Completed plans call for site work for a water / sewer project.

Transfer Station Wastewater Pumping, Hauling and Disposal SCOPE OF WORK 1. The County of Lexington is soliciting proposals from qualified offerors for a term contract for pumping of wastewater from an 8,000-gallon storage tank (UST), and a 10,000-gallon storage tank (UST) located at the Edmund Landfill Transfer Station and hauling to a designated wastewater disposal site. This wastewater is generated from the wash down of the floor area, rainwater and domestic waste. Approximately 93,675 gallons of wastewater were disposed of in the past fiscal year. Additionally, the qualified offeror will be required to pump solids from the bottom of both tanks and haul to a designated disposal site for processing, approximately once per year. 2. The successful offeror must have the ability to pump into their hauling vehicle through a 4" suction pipe from the two separate wastewater tanks, transport and discharge the wastewater from the Transfer Station facilities to a wastewater treatment plant (WTP). 3. Wastewater from the County's older Transfer Station collects in an 8,000-gallon underground storage tank (UST) equipped with an alarm device, which will provide a visual and audible signal when the tank reaches 50 percent capacity (4,000 gallons) and 75 percent (6000 gallons). Wastewater from the new transfer station expansion collects in a 10,000-gallon underground storage tank (UST) equipped with an alarm device, which will provide a visual and audible signal when the tank reaches 50 percent capacity (5,000 gallons) and 80 percent capacity (8,000 gallons). The Transfer Station will notify the successful offeror when either UST has reached 50 percent capacity and that the UST may be evacuated. 4. In cases that suspected hazardous constituents exists or are present at point of discharge and exceed the WTP permit, the successful offeror must provide a stand-by storage. The stand-by storage must hold no less than 6,000 gallons of the suspicious water. The Transfer Station personnel will then notify the designated laboratory of the need to collect and analyze a sample of each shipment from the transport vehicle. It is anticipated that the sample results will be available within ten (10) days of collection. Lexington County will be responsible for the cost of sampling and analysis. All evacuated material is to remain at the Transfer Station in a sealed, locked container (transport vehicle). As soon as the results are received from the laboratory, the successful offeror will be authorized to deliver the shipment to the alternate WTP. Solely the County of Lexington will handle the cost for disposal at alternate WTP. 5. The successful offeror is expected to collect wastewater samples, at the point of discharge, during the contract period. The offeror will provide a copy of these laboratory analyses to the County. All inquiries concerning this RFP should be directed to: Melissa Chappell Procurement Officer County of Lexington Phone: 803-785-8319 Fax: 803-785-2240 Email: mchappell@lex-co.com The Transfer Station wastewater tank facilities may be inspected prior to submitting this bid proposal by contacting Mr. Jeremy Hallman at (803) 755-3325. The Transfer Station facilities will be available for inspection only between 8:00 AM and 4:00 PM

Post-Bid

Water / Sewer

$40,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
145
Bidding Soon
1,357
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2022

March 1, 2022

Project location map

Multiple Locations, Lexington, SC

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed