BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 5, 2022 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Doniphan, Nebraska. Contact the soliciting agency for additional information.

For purchasing, excavating and hauling excessive soil from a future waste stabilization pond site. Soil must be removed by April 22, 2022. The Owner reserves the right to reject any or all proposals; and to waive irregularities or informalities to accept the Proposal it deems most beneficial.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
20
Bidding Soon
240
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2022

February 18, 2022

Project location map

To Be Determined, Doniphan, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.