BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a mixed-use development in West Valley City, Utah. Working plans call for the demolition of a pre-engineered storage facility; for the construction of a pre-engineered storage facility; for site work for a pre-engineered storage facility; water / sewer project; water / sewer project; and water / sewer project.

The Ridgeland Pump Station project will replace and upgrade the Ridgeland Booster Pump Station and generator. The existing water storage tank/reservoir and storage building onsite will remain. The following existing infrastructure will be demolished and relocated: control valve shed, booster pump station building and generator building. Additionally, the existing refueling station will be relocated. The site improvements include adding stormwater detention basins and a tie-in from them to West Valley City's stormwater system. The project also includes a new 16-inch waterline onsite and removing existing 14-inch asbestos cement pipe. Finally, the project includes various site work and yard piping. The project will be implemented within the footprint of the existing site. The project is needed to upgrade outdated facilities that are well beyond their useful life due to their age and, thus, create an operational risk for the District. Construction of the project is anticipated to begin Spring 2023, pending Division of Drinking water design and environmental approval. The electrical panel and PLC will be manufactured by APCO. This project is likely using State Revolving Funds, and thus will need to adhere to federal requirements for all materials and equipment and wages. This includes Davis Bacon wages and other BABA requirements. End of question and answer period March 17, 2023 Notice of Award April 18, 2023 Contract Agreement April 25, 2023 Notice to Proceed April 25, 2023 substantially complete on or before April 16, 2024 Date of Final Completion May 16, 2024 MBE (6.0%), WBE (6.9%) Confirmed shortlist

Final Planning

Water / Sewer

$4,000,000.00

Public - City

Demolition, New Construction, Site Work

82

18

30

2

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
31
Bidding Soon
539
All Active Projects
255
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2023

June 5, 2023

img_map_placeholder

2400 3600 W, West Valley City, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.