BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2022 at 7:00 PM

Updated January 29, 2024

Site work and paving for a road / highway in Redding, California. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

NTRODUCTION The City of Redding Public Works Department is soliciting proposals to provide professional engineering and right of way services for the Stillwater Business Park (SWBP) Phase 2 Projects. It is the intent of the City to hire a qualified consultant who can provide engineering services culminating in contract documents including plans, specifications, and construction cost estimates, complete and ready for invitations for bid for multiple projects to support the development of the Stillwater Business Park. The Stillwater Business Park is a 667 Acre master planned business park located in the City of Redding (see attached site map). The SWBP has developable parcels ranging from 4 acres and 92 acres in size and is adjacent to the Redding Municipal Airport. The City as a part of the Phase 1 project has constructed the backbone infrastructure including but not limited to road, bridges, sewer, water, electric and communication facilities to Lot 12 of the SWBP. Due to recent activity and parcel sales in the SWBP the City is looking to begin Phase 2 improvements to extend infrastructure to the remainder of the SWBP and provide road access to Fig Tree Lane and Airport Road on the south. In addition the City anticipates developing additional traffic mitigation projects for design and construction. The proposed improvements are as follows: o Approximately 2.5 miles of roadway of various typical sections meeting the traffic demands of the Park and adjacent roadway segments per limits as shown on the attached site map. GHD Inc. is currently updating traffic studies performed for the Park to determine typical sections requirements for these roadways. See attached sample typical sections. Consultant will coordinate and incorporate results of the traffic study into the project. o Develop design alternatives for the realignment of a signalized intersection at Airport Road and Fig Tree lane to incorporate future development and improvements on Airport Road. o Realignment of Fig Tree Lane at intersection of Venture Pkwy and Fig Tree Lane o Approximately 13,100 lineal feet of 16 inch ductile iron water main o Approximately 5,000 lineal feet of sewer main including manholes at about 500 foot spacing. o Approximately 12,500 lineal feet of joint utility trench for REU electric, PG&E distribution gas, AT&T, Spectrum and other services. o Required storm drainage facilities The method of contractor selection has not been determined at this time. As of January 13, 2022, the due date has been confirmed with the owner.

Conceptual

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
1
Bidding Soon
152
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2023

Project location map

Multiple Locations, Redding, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.