BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 27, 2025 at 8:00 PM

Updated October 28, 2025

Demolition, site work and addition to a transportation facility in Redmond, Oregon. Completed plans call for the addition of a transportation facility; for the demolition of a transportation facility; and for site work for a transportation facility.

Scope details have not been disclosed. As of October 27, 2025 construction is underway. All subtrades have been filled. The original solicitation follows below. ____________________________________________________________ City of Redmond is soliciting proposals from qualified firms or contractors to provide certain construction manager/general contractor (CM/GC) services for the Redmond Municipal Airport terminal building expansion project. The Project includes a major building expansion of RDM's commercial service passenger terminal building. City has established an overall DBE goal for FY2023 of 2.71%, which includes both race neutral (.08%) and race conscious (2.63%) DBE goals. The selected Proposer must provide at least the minimum race conscious DBE goal percentage and encourage DBE participation to meet the DBE goal or perform and provide adequate good faith effort procedures in accordance with FAA DBE compliance procedures. New DBE goals will be developed for contracts in FY 2024, 2025, etc. The selected Proposer will not discriminate on the basis of race, color, national origin, or sex in the performance of any contract executed pursuant to this RFP. The Proposer must carry out all applicable requirements of 49 CFR Part 26 in the award and administration of Department of Transportation assisted contracts. Notice to Proceed. If Construction Phase Services are added to the Contract as set forth in Article 3.2, City will issue a Notice to Proceed based on the below preliminary schedule: o Preconstruction services phase: April 2023 - October 2023 o Early Work/Procurement Amendment (if required): Starting December 2023 o Construction Phase Services (GMP) Packages: Starting March 2024

Under Construction

Transportation Terminals

$200,000,000.00

Public - City

Addition, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
107
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2023

October 13, 2025

Project location map

2522 Jesse Butler Cir, Redmond, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.