Site work for a development in Houston, Texas. Completed plans call for site work for a development.

The work consists of construction of approximately 1,050 linear feet of a bolted 6-foot tall black wrought iron fence along the southern and eastern property lines of the Pine Forest Green detention pond. The deadline to ask questions is 1/24/2022 11:00 AM CST The project is located in Barker-Cypress Municipal Utility District in Harris County, Texas, north of Clay Road, south of Kieth Harrow Boulevard, east of Windsong Trail Drive, and west of Queenston Boulevard. Within 10 days from the date of the Notice to Proceed, the Contractor shall submit a construction schedule to the Engineer for approval. The schedule shall be in the form of a Gantt Chart (bar chart) and shall indicate the order in which the work is to be performed. The sequence and interdependence of all major activities must be shown. The schedule shall be drawn to a calendar time scale. The commencement and completion dates for each activity shall be shown, as well as the duration in calendar days, for each activity. The schedule shall show not only the activities for actual physical construction of the project, but also the activities such as the Contractor's submittal of shop drawings and the Engineer's review and approval of the shop drawings. Failure to include any element of work required to complete the project within the scheduled contract time shall not release the Contractor from his obligation to complete the work in accordance with the contract documents. If the actual progress of the work falls behind the Contractor's approved construction schedule, the Owner may elect to deduct the value of work scheduled but not completed from progress payments due. The value of the work will be determined from the Contractor's approved schedule of values. These deductions will continue until the Contractor has taken steps to bring the progress of the project back in line with the approved construction schedule.

Bid Results

Conservation and Development

$58,195.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
61
Bidding Soon
2,766
All Active Projects
1,124
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.