BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 11, 2022 at 7:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Albuquerque, New Mexico. Conceptual plans call for site work for a water / sewer project.

Electronic submittal of Proposals by the deadline is required unless preapproved by the Water Authority. No Proposals will be accepted after the time and date specified. The Water Authority is not responsible for the delivery of Proposals. Scope of Services: The Water Authority requires planning and design services for Phase 8 and Phase 9 of the South Valley Drinking Water Project (SVDWP), which has expanded potable drinking water availability throughout the South Valley of Albuquerque. Phase 8 and Phase 9 will expand waterline infrastructure on the west side of Coors Blvd. from Rio Bravo Blvd. down to Malpais Rd.

Conceptual

Water / Sewer

$500,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
23
Bidding Soon
319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2023

Project location map

Coors Blvd NW, Albuquerque, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.