BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Silver City, New Mexico. Completed plans call for the renovation of a educational facility.

Until final award, Western New Mexico University reserves the right to reject any and/or all RFP's to waive technicalities, to re-advertise and to proceed otherwise when in the best interest of the University. RFP's shall be submitted sealed, plainly marked with the date, RFP name and number. The CMAR shall actively participate as a member of the Project Team with WNM and the Design Professional beginning with design concept and constructability reviews and construction cost estimating at the completion of Programming and will continue through the Design, Construction, Commissioning, Closeout and Warranty phases of the Project. The purpose of these Preconstruction, Construction, Commissioning, Closeout and Warranty responsibilities is to provide the expertise necessary to ensure that the Program objectives are realized, the Project budget and Schedule are met, the facility is fully operational when occupied, and defects detected during the Warranty Period are addressed. The CMAR shall provide Preconstruction services, including, but not limited to attending and participating in design meetings with WNMU and the Design Professional, attending and participating in LEED meetings and charrettes with WNMU and the Design Professional, identifying safe work practices and requirements for construction, assessing and recommending site logistics requirements, recommending phasing and sequencing of the work, construction scheduling, cost estimating, assessing alternative construction methods and products for Value Engineering and life cycle cost considerations and participating in WNMU's phased design and construction document reviews utilizing BIM and REVIT technology. The CMAR shall propose a Guaranteed Maximum Price, which shall be the sum of the estimated Cost of the Work, its Preconstruction Fee (not to exceed two percent of the Guaranteed Maximum Price) and its proposal for Specified General Conditions and Construction Manager at Risk Fee (CMAR Fee). The CMAR shall indicate the percentage of the Guaranteed Maximum Price that it will perform with its own work forces.

Award

Educational

$4,500,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
20
All Active Projects
9
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2022

March 25, 2022

img_map_placeholder

1000 W College Ave, Silver City, NM

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.