BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Butte, Montana. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

Project was awarded to R&S Johnson Construction of Anaconda, MT. The final project closed out at $917,038.55. The Work will consist of, but is not necessarily limited to, providing all labor, materials, earthwork, and incidentals necessary to complete the Work as shown on the Drawings and described in the Special Provisions and Technical Specifications. The Work at Site 1 consists of constructing approximately 1.2 miles of asphalt surfaced trail from the north end of Durant Canyon to Fairmont Road, constructing the Gregson Station trailhead, amenities, and access road, and installing trail and road signage. The Work also includes repairing, replacing, or installing approximately 2.7 miles of barb wire fence, installing 6 barb wire gates and 1 cattle guard, enhancing the Fairmont/Milwaukee Road approach, installing approximately 265 feet of buried stock water pipeline and 1 stock tank including valves and fittings, and other works as shown on the Drawings and described in the Special Provisions and Technical Specifications. The Work at Site 2 consists of installing one 46-foot long prefabricated steel bridge across Silver Bow Creek, driving bridge helical piers, constructing reinforced concrete bridge caps, constructing approximately 1,250 linear feet of gravel access road, installing approximately 1,975 linear feet of smooth wire fence, constructing and reclaiming temporary access roads, installing culverts, and other works as shown on the Drawings and described in the Special Provisions and Technical Specifications. Construction will be completed in 2022 with no winter shutdown period. The Project includes all incidental work necessary to complete the Work as shown on the Drawings and described in the Special Provisions and Technical Specifications. The Pre-Bid Conference and Site visit will continue at Site 1, located at the proposed Gregson Station trailhead off Fairmont Road (approximately 1 mile east of Fairmont Hot Springs), following completion of the Site 2 visit. Potential Bidders are required to attend the entire Pre-Bid Conference, including the Site visit. Failure to attend the entire Conference and Site visit is grounds for Owner to determine that Bidder's bid is non-responsive. The Greenway Service District will make reasonable accommodations for individuals with disabilities who wish to participate. If an accommodation is required, please contact Dori Skrukrud at (406) 497-6469 or dskrukrud@bsb.mt.gov. All questions about the meaning or intent of the Contract Documents are to be submitted in writing no later than 3:00 P.M. local time on February 4, 2022. Questions may be emailed to Dori Skrukrud at dskrukrud@bsb.mt.gov. Questions will receive an email confirmation of receipt. If no confirmation is received, contact Dori Skrukrud at (406) 497-6469 or dskrukrud@bsb.mt.gov. Responses to questions and any Addenda will be issued no later than 5:00 P.M. local time on February 10, 2022. The responses and Addenda will be made available electronically through a Sharefile internet link sent to Bidders' e-mail addresses provided from the Plan Holder's List at the mandatory Pre-Bid Conference, on the Issuing Office website, and on the website.

Occupancy

Bridges / Tunnels

$917,039.00

Public - City

Paving, Site Work

56

13

11

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
5
Bidding Soon
92
All Active Projects
47
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.