BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 30, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Coldwater, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of June 30, 2022, the project has been awarded. A timeline for construction has not been confirmed. Project No. 086739.02 The approximate quantities of the major items of Work are: 1,475 lf 8-inch D.I. Water Main 1,350 lf 12-inch D.I. Water Main 590 lf 8-inch Sanitary Sewer 360 lf 12-inch Storm Sewer 2,120 tons Bituminous Pavement 3,000 lf Curb and Gutter 9,300 sf Concrete Sidewalk 5,150 sf Concrete Driveway Approach The Work will be substantially completed on or before Friday September 30, 2022 and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions on or before Friday November 4, 2022. A. The Work covered by the Contract Documents comprises furnishing and installation of 1,350 linear feet of 12-inch water main located in S Michigan Avenue between Sauk River Drive and Chicago Street, 750 linear feet of 8-inch water main, 590 linear feet of 8-inch sanitary sewer main, and 260 linear feet of 12-inch storm sewer in Washington Street between Elm Street and Sprague Street, 675 linear feet of 8-inch water main, pavement and sidewalk rehabilitation along South Perkins Street between Elm Street and Sprague Street, and mill and fill along Sprague Street between Washington Street and the railroad tracks north of Sauk River Drive for Coldwater Board of Public Utilities, Owner. B. The Work includes the following major items: 1. Ductile iron water main installation including hydrants, valves, fittings, and services. 2. Sanitary sewer installation including manholes, services, and cleanouts. 3. Storm sewer installation including catch basins and manholes. 4. Concrete driveway and sidewalk reconstruction including ADA ramps. 5. Road construction and resurfacing including bituminous pavement, aggregate base, aggregate shoulder work, and sand subbase. 6. Soil erosion and sedimentation control. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Roads / Highways

$700,000.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
190
Bidding Soon
1,960
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2022

March 3, 2022

Project location map

Multiple Locations, Coldwater, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.