Site work and new construction of a mixed-use development in Baraboo, Wisconsin. Completed plans call for the construction of a municipal facility; for site work for a municipal facility; parking garage; and parking garage.

The Baraboo project consists of the construction of a new County Highway Department headquarters facility. The facility includes main business functions, including office areas, meeting rooms, breakroom, restrooms and locker rooms, data center, etc. It also includes multiple areas to support daily operations, including a fleet parking garage, vehicle wash bays, a full vehicle repair garage, paint booth room, sandblast room, welding shop, etc. The facility is approximately 164,640 square feet, including second floor storage areas. The Sauk County Highway Department will remain in full operation for the duration of the project, in the existing Baraboo facility and surrounding site areas. Once the Department relocates into the new facility, the existing facility will be abandoned and demolished as a part of the project. Work scopes include, but are not limited to, demolition, civil and landscape, asphalt paving, concrete, structural steel, elevator, overhead cranes, precast walls and floors, membrane roofing, carpentry, doors and windows, interior and exterior finishes, mechanical, electrical, plumbing, fire protection and fire alarm, information technology, audio visual, security, low voltage, and operations equipment. A new salt storage building is also included in the project scope, as well as additional work within other existing buildings on the site. The Reedsburg project consists of the construction of a new County Highway Department satellite facility. The facility includes support business functions, including limited office area, meeting room, breakroom, restrooms and locker rooms, etc. It also includes areas to support daily operations, including a fleet parking garage and vehicle wash bay. The facility is approximately 44,965 square feet, including mezzanine storage areas. The Sauk County Highway Department will vacate the existing Reedsburg facility prior to the start of construction, and existing buildings will be demolished as a part of the project. Work scopes include, but are not limited to, demolition, civil and landscape, asphalt paving, concrete, structural steel, overhead crane, precast walls and floors, membrane roofing, carpentry, doors and windows, interior and exterior finishes, mechanical, electrical, plumbing, fire protection and fire alarm, information technology, audio visual, security, low voltage, and operations equipment. A new salt storage building is also included in the project scope. Intent of Contract Award - Anticipated the week of February 14, 2022, pending Sauk County Board potential approval. Bidders will be required to provide Bid security in the form of a Bid Bond for a sum no less than 5 percent of the Bid Amount. 5. Awarded Contractor or Contractors will be required to furnish a 100% Performance security and 100% Payment security, per the Contract Documents Owner reserves the right to accept or reject any or all Bids, and to waive technicalities in any Bid or part thereof, and to accept the Bid or Bids deemed to be in their best interest. For any questions regarding obtaining documents or the plan holders list, contact Jim Glass representing BPI Color by phone at (414) 327-5010 or email jglass@bpicolor.com The Owner encourages Minority-owned Business Enterprises (MBEs), Women's Business Enterprises (WBE's), and Small Businesses in Rural Areas (SBRA's) to submit bids.

Post-Bid

Municipal

$800,000.00

Public - County

New Construction, Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
31
Bidding Soon
542
All Active Projects
213
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

March 14, 2022

img_map_placeholder

Multiple Locations, Baraboo, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.