Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published March 1, 2022 at 7:00 PM
Updated November 15, 2023
Renovation of an educational facility in Worcester, Massachusetts. Completed plans call for the renovation of a educational facility.
DCAMM Certificate. The Work shall commence immediately upon Notice to Proceed and shall be Substantially Complete within 180 calendar days. The applicable minority workforce utilization percentage is 15.3%. The applicable women workforce utilization percentage is 6.9% Construction of an exterior ramp and stair, relocation of an exterior exhaust fan, paving, landscaping, door and hardware replacement, painting. Work included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following: 1. Footings. 2. Foundation walls. 3. Slabs-on-grade. SCOPE OF WORK A. Provide all labor, materials, equipment, controls and accessories necessary for a complete and operable system and as required by the equipment manufacturers installation instructions. B. The work to be done under this Division includes all related work shown on the Drawings and or included in these Specifications. C. The mechanical contractor shall include in the project a full-service contract for the HVAC system during the warrantee period including system changeover where applicable. D. Provide commissioning of all mechanical systems; the general contractor as well as all sub-contractors shall corporate with the commissioning agent and provide all required information to aid in system commissioning. E. Drawings are diagrammatic and all required duct, pipe, fitting, device, and component required to complete the installation in the actual space are not necessarily shown. Changes in duct or pipe size, shape, and route must be coordinated and approved prior to fabrication or installation. Department Code: QCC 8550 Bid Result : 04 00 01 Masonry - G.V.W., Inc. - $122,500.00 05 00 01 Misc. and Ornamental Iron - Atlantis Corporation East - $ 132,240
Bid Results
Educational
$254,740.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 2, 2022
April 4, 2022
670 W Boylston St, Worcester, MA
Related To This Project
Worcester, MA
Bid Date: Mar 17 2021
Worcester, MA
--
Worcester, MA
Bid Date: Mar 02 2022
Worcester, MA
--
Worcester, MA
Bid Date: Mar 09 2022
Worcester, MA
Bid Date: Mar 09 2022
Worcester, MA
Bid Date: Mar 02 2022
Worcester, MA
Bid Date: Mar 02 2022
Worcester, MA
Bid Date: Mar 03 2022
Worcester, MA
Bid Date: Jul 14 2021
Worcester, MA
Bid Date: Nov 03 2021
Worcester, MA
Bid Date: Jan 26 2022
Worcester, MA
Bid Date: Feb 16 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed