BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 26, 2022 at 7:00 PM

Updated November 15, 2023

Site work for a road / highway in Necedah, Wisconsin. Completed plans call for site work for a road / highway.

Furnishing and installation of all labor, materials, permits, equipment, tools, supplies, etc., for complete operating installation of the 2022 Street Lighting Improvements. \ Approximate quantities of work on the 2022 Street Lighting Improvements to be expected are as follows: BASE BID VILLAGE CENTER LIGHTING \ 12 EA - Inlet Protection \ 70 EA - Remove Lighting Unit \ 70 EA - Concrete Base, Special \ 70 EA - Street Lighting Unit, Type 4 \ 33,000 LF - Electrical Wire, Lighting \ 11,200 LF - Conduit Rigid, Nonmetallic, Schedule 40, 2-Inch \ 20 EA - Pull Boxes, Steel, 24 x 36-Inch \ 1 EA - Street Lighting Control Center \ 6 EA - Street Lighting Unit, Type 4, for Stock \ 16 EA - Refurbish Existing Lighting Unit \ ALTERNATE M MUNICIPAL PARKING LOT LIGHTING \ 6 EA - Remove Lighting Unit \ 5 EA - Street Lighting Unit, Type A \ 1 EA - Street Lighting Unit, Type B \ 1 EA - Street Lighting Unit, Type A, for Stock \ Together with appurtenant construction. A certified check or bid bond payable without condition to the Village of Greendale in an amount not less than five percent (5%) of the bid shall be submitted with each bid as a guarantee that if the bid is accepted a proper contract and bond will be executed and filed within 10 days after the acceptance of the bid. If such bidder fails to execute and file such contract and bond, the amount of the check or bid bond shall be forfeited as liquidated damages. Bidders Proof of Responsibility Form" with the Village Engineer on or before 4:00 p.m. on January 20, 2022. No bid shall be withdrawn after the opening of bids without the consent of the Village of Greendale for a period of sixty (60) days after the time of opening bids. Each bidder agrees upon submission of bid that if the same be accepted within said time period, he shall be bound by the terms of acceptance hereinafter contained. \ The Village of Greendale reserves the right to reject any or all bids received or to accept any bid which may be to the best interest of the Village. Each successful bidder will be required to furnish a satisfactory performance bond in the sum of the full amount of the contract. Pre-Qualification: Yes

Bid Results

Roads / Highways

$729,157.00

Public - City

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
47
Bidding Soon
711
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2022

August 15, 2022

Project location map

Multiple Locations, Necedah, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.