BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Milwaukee, Wisconsin. Completed plans call for the renovation of a water / sewer project.

The Contractor shall replace tail bearing assemblies on three grit dewatering screw conveyors at the Jones Island Water Reclamation Facility in Milwaukee, Wisconsin. The tail bearing assemblies shall include a mechanical seal assembly and new stub tail shaft. The Contractor shall procure the tail assemblies and flushing water control devices from a fabricator designated by the District and install both on each of the three existing Grit Dewatering Screw Conveyors. The Contractor shall tie into existing conduit of each existing Zero Speed Switch Panel and install galvanized rigid conduit and control wiring to each new solenoid valve on the plant (W3) flushing water supply to each corresponding seal assembly. Control wires to be terminated at both locations by Contractor. The Contractor shall also run galvanized pipe, tying into an existing W3 water supply pipe, and connecting to the flushing and quench portals on each of the mechanical seal assemblies. The quench water discharge (drain) shall also be piped open ended to the top of each trough. The Contractor shall complete work no later than 180 days after the Notice to Proceed. March 1, 2022 Notice to Proceed (estimated) Contract Completion 180 calendar days after Notice to Proceed

Post-Bid

Water / Sewer

$500,000.00

Public - County

Renovation

18

14

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
67
Bidding Soon
1,253
All Active Projects
531
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2022

March 1, 2022

img_map_placeholder

700 E Jones St, Milwaukee, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.