BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2022 at 7:00 PM

Updated January 25, 2024

Renovation of a mixed-use development in Shoshoni, Wyoming. Completed plans call for the renovation of a educational facility.

Estimated budget for the UPS's is about $85,000. No estimated budget for time and materials at this time. The Board of Trustees of Fremont County School District No. 24, Shoshoni, Wyoming is accepting bids for electrical work to be performed prior to August 19th, 2022, the beginning of the school year. The Board reserves the right to reject any and all bids and to waive irregularities and informalities in the bidding. The Board of Trustees of Fremont County School District No. 24, Shoshoni, Wyoming is accepting bids for electrical work to be performed prior to August 19th, 2022, the beginning of the school year. The Board reserves the right to reject any and all bids and to waive irregularities and informalities in the bidding. Replace line-interactive APC Smart-UPS units with double-conversion, online Eaton 9PX UPS units, types and quantities are defined on the bid form. Confirm, correct, and/or upgrade grounding and bonding for transformers and six (6) clustered I.T. equipment rack locations Rewire the four (4) Panel "L13" circuits feeding the I.T. racks in Room 807 using the existing 1" conduit. Rewire each 120V circuit with 3- #10. This is an Exception to the 6 current-carrying conductors [maximum] in conduit requirement. (These circuits are fed from Panel "L13" which also supplies the refrigerator and freezer appliances in the kitchen. Inrush current from the appliances causes excessive voltage dips displayed in this graph.) Rewire circuits as needed to reduce the number of current-carrying conductors in a conduit to six (6) or less. Bear in mind that the grounded conductor (neutral) of a 2-wire circuit is a current-carrying conductor, thus three 277V (line-to-neutral) lighting circuits or three 120V (line-to-neutral) receptacle circuits shall be the maximum routed through any given conduit. Upsize #12 to #10 for problematic 20A circuits longer than 70 feet

Award

Educational

$149,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
1
Bidding Soon
101
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2022

February 17, 2022

Project location map

To Be Determined, Shoshoni, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.