BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Pleasant Hill, Iowa. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Site Directions: Site is located between NE 71st Street and NE 75th Street south of University Avenue / IA Hwy 163. For consideration by the City Council at its meeting on Tuesday, February 8th, 2022 at 6:00 p.m. in said Community Room at the Public Safety Building. Contractor shall fully complete all grading, pavement removal, storm sewer installation, RCB culvert installation, water main installation, subdrain, subgrade preparation, modified subbase, PCC pavement, pavement markings, and miscellaneous associated work for the development of the trail south of Martha L. Miller Drive and construction of 2,525' of Martha L. Miller Drive between NE 70th Street and NE 75th Street. The project also includes storm sewer installation, water main installation and other miscellaneous work to complete the improvements no later than December 1, 2022. Should the contractor fail to complete all grading, pavement removal, storm sewer installation, RCB culvert installation, water main installation, subdrain, subgrade preparation, modified subbase, PCC pavement, pavement markings, and miscellaneous associated work in this timeframe, liquidated damages in the amount of one thousand dollars ($1,500.00) per calendar day after December 1, 2022 will be assessed. Surface restoration shall be fully completed by June 1, 2023 or incur liquidated damages in the amount of one thousand dollars ($1,000.00) per calendar day thereafter. The work includes all materials, equipment, transportation, and labor necessary to complete the roadway extension. The proposed project includes the development of the trail south of Martha L. Miller Drive and construction of 2,525' of Martha L. Miller Drive between NE 70 th Street and NE 75 th Street. The project also includes storm sewer installation, water main installation, RCB culvert installation and other miscellaneous work to complete the improvements.

Bid Results

Roads / Highways

$2,781,058.00

Public - City

Paving, Site Work

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
33
Bidding Soon
558
All Active Projects
238
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2022

March 4, 2022

img_map_placeholder

Martha L. Miller Drive east, Pleasant Hill, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.