BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Woodland, California. Completed plans call for site work for a bridge / tunnel.

Award Timeline - April 5, 2022. For furnishing all labor, material, tax, transportation, equipment, and services necessary for: Yolo Bypass West Levee Culvert Replacement Project, CIP 20-06 The project generally consists of the following: The Project will replace three 48-inch culverts in the Citys Outfall Channel at the intersection with the Yolo Bypass West Levee with a single cast-in-place concrete box culvert with four bays. Cast-in-place concrete headwalls will be constructed at the inlet and outfall structures. The cast-in-place culvert will be approximately 115 feet long with four 6-foot by 6-foot bays. The individual bays will be fitted with flap gates at the outfall structure and will include a closure structure equipped with emergency isolation slide gates. A six-month construction period (May through October) is anticipated that includes cofferdam construction and dewatering, excavation and demolition, construction of the new culvert, reconstruction of the Yolo Bypass West Levee, and cleanup and restoration. In-channel work is restricted to June 1 through October 31. The Citys estimated cost of the improvements is $2,500,000. This project shall be conducted in accordance with the plans, specifications and other contract documents, all of which may be obtained as per section A-2 of this Notice Inviting Bids. The project consists of the following: The Project will replace three 48-inch culverts in the City's Outfall Channel at the intersection with the Yolo Bypass West Levee with a single cast-in-place concrete box culvert with four bays. Cast-in-place concrete headwalls will be constructed at the inlet and outfall structures. The cast-in-place culvert will be approximately 115 feet long with four 6-foot by 6-foot bays. The individual bays will be fitted with flap gates at the outfall structure and will include a closure structure equipped with emergency isolation slide gates. A six-month construction period (May through October) is anticipated that includes cofferdam construction and dewatering, excavation and demolition, construction of the new culvert, reconstruction of the Yolo Bypass West Levee, and cleanup and restoration. In-channel work is restricted to June 1 through October 31

Award

Bridges / Tunnels

$2,697,320.00

Public - City

Site Work

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
301
Active Projects
147
Bidding Soon
2,715
All Active Projects
1,088
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 15, 2022

July 1, 2022

October 31, 2022

img_map_placeholder

County Rd 22, Woodland, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.