BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a sidewalk / parking lot in Lake Worth, Florida. Completed plans call for site work for a sidewalk / parking lot.

The City of Lake Worth Beach is soliciting bids from responsible and experienced entities to replace the existing railing at the City of Lake Worth Beach boardwalk located at 10 South Ocean Blvd. Lake Worth Beach, FL 33460. Question Deadline: Fri Jan 28, 2022 4:00 PM (EST) The work to be performed under this IFB shall commence on the date of Notice to Proceed. The work shall be substantially completed within 90 calendar days afterthe date of such notice, and fully completed within 105 calendar days The City of Lake Worth Beachjg soliciting bids from responsible and experienced entities to remove the existing wooden railing and fabricate and install new aluminum railing at the City of Lake Worth Beach boardwalk located at 10 South Ocean Blvd. Lake Worth Beach, FL 33460. A more detailed scope of work is attached and incorporated into to this IFB as Exhibit A The City of Lake Worth Beach has identified the existing railing at the City of lake Worth Beach boardwalk to be unreliable and in need of full Replacement to meet current Federal, State, Local and ADA safety and Code standards. The City has identified the following scope of work to be completed by the selected contractor: 1. Contractor shall thoroughly inspect and familiarize itself with the existing railing at the Boardwalk 2. Contractor shall prepare neces&ary documents (shop drawings, design, construction drawings, etc.) to submit for permitting to the City, State and other applicable agencies. 3. Contractor shall submit to the Citys BuildingDepartment and apply for necessary permits to authorize and permit work. Permit fees to be paid for by contractor and included in cost proposal. 4. The contractor shall demolish, remove, and dump, in a legal location, existing wooden handrails. 5. The Contractor shall fabricate and install new aluminum handrails that conform to the plans included in the attachment to the solicitation. 6. All the work shall be completed during the work week, Monday to Friday. No work shall be permitted during the weekend. 7. No section of the handrail is to be held open for more than 48 hours and no sections shall be open over the weekend. 8. All work to be substantially completed within 90 calendar dfaylb and final completion within 105 calendar days. 9. Contractor shall submit a schedule with their proposal. 10. All work shall be in compliance with all applicable OSHA safety standards

Bid Results

Sidewalks / Parking Lot

$84,400.00

Public - City

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
49
Bidding Soon
1,130
All Active Projects
504
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2022

March 10, 2022

img_map_placeholder

10 S Ocean Blvd, Lake Worth, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.