Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a military facility in Cannon AFB, New Mexico. Design plans call for the renovation of a military facility.
As of September 23, 2022 an engineer/design team has been selected. This is a design-build project. The Design-Build Contractor shall furnish all services, materials, supplies, equipment, investigations, studies, supervision and travel necessary to produce construction drawings and specifications that completely and accurately represent the intent of the Statement of Objectives (SOO). The objectives of this work include, but are not limited to: a) Design, demolition, construction & replacement of equipment in the upgrade of the Heating, Ventilation & Air Conditioning (HVAC) for Building 12. Work shall consist of but is not limited to the upgrade of the demolition & replacement of the existing HVAC and all associated components; ventilation units, fan coils, ducting as required, grilles, diffusers, piping and Alerton DDC controls. Work shall include design and install of electrical in support of the new HVAC, which shall include as a minimum the upgrade of the Master Distribution Panel, Panel A-1, and Panel P. b) Additional repairs to be made to existing fire suppression system, including pipe length changes and repair of broken escutcheons in specified locations. Removed items shall be replaced with new work to counter increased heat load. Estimated Magnitude of Construction: Between $1,000,000 and $5,000,000
Design
Military
$1,890,434.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 25, 2022
110 Alison Ave, Cannon AFB, NM
Related To This Project
Cannon AFB, NM
Bid Date: Sep 30 2022
Cannon AFB, NM
--
Cannon AFB, NM
Bid Date: Mar 13 2023
Cannon AFB, NM
Bid Date: Mar 10 2023
Cannon AFB, NM
Bid Date: Mar 10 2023
Cannon AFB, NM
Bid Date: Jun 14 2023
Cannon AFB, NM
Bid Date: Jun 08 2023
Cannon AFB, NM
--
Cannon AFB, NM
Bid Date: Jun 16 2017
Cannon AFB, NM
Bid Date: Sep 16 2022
Cannon AFB, NM
--
Cannon AFB, NM
Bid Date: Aug 15 2022
Cannon AFB, NM
--
Cannon AFB, NM
Bid Date: May 31 2018
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.