Site work, asbestos abatement and renovation of a mixed-use development in Bedford, Massachusetts. Design plans call for the renovation of a medical facility; for asbestos abatement for a medical facility; and for site work for a medical facility.

AWARD NUMBER* 36C24122C0091 AWARD AMOUNT* $1,617,149.51 LINE ITEM NUMBER AWARD DATE (MM-DD-YYYY)* 09-20-2022 AWARDEE NAME* WEST POINT ENGINEERS, LLC CONTRACTOR'S UEI DEJEN69ZLAX5 AWARDEE ADDRESS LINE 1* AWARDEE ADDRESS LINE 2* AWARDEE ADDRESS LINE 3* 1941 BISHOP LN STE 400 AWARDEE ADDRESS LINE 4* AWARDEE CITY LOUISVILLE AWARDEE STATE KY AWARDEE ZIP CODE 40218 Sol No: 518-22-109,36C24122Q0174 OVERVIEW 1.1 Government Agency Department and Address: Edith Nourse Rogers Memorial Veterans Hospital 200 Springs Rd. Bedford, MA 01730 1.2 Project Title, Number and Location: Project Title: Asbestos Abatement: Corridors Project Number: #518-22-112 1.3 Scope of Work Provide all professional architectural and engineering (A/E) services necessary to develop complete construction drawings, specifications, cost estimates, project phasing's, site visits, and construction period administration associated with an abatement project. The intent of this project is to abate the Asbestos containing flooring and mastic in the connecting and building corridors that comprise the closed pedestrian circulation loop on the Bedford Campus and replace it with a durable, aesthetically pleasing flooring material that projects the health and stimulating environment veterans and staff deserve. It is of equal importance to plan the work in phases to minimize service interruptions, given the importance of this corridor system to the daily functioning of the VA Medical Center Work will include, but not be limited to, architectural, and other relevant specialty consultants required within the constraints of the construction budget consistent with the VA's project team goals as prioritized during project meetings and field surveys. A/E will include phasing plan, or additional impact needs and costs, to reduce impact to VAMC.. 2. DESCRIPTION OF WORK -- 2.1 General: Conduct preliminary meetings and site survey investigations to define the necessary elements of the project scope of work fulfilling the goals of the VA's project team (Engineering Svc), and presentation of preliminary detail plans with proposed alternatives to the Facilities Engineering Group. Based on User Group meetings and site surveys, prepare a detailed project plan description report pertinent to the project requirements within the constraints of the construction budget consistent with the VA's project team goals. All design submission requirements shall be in accordance to A/E Contract and conform to all VA criteria and standards, in addition to Commonwealth of Massachusetts state codes and regulations. 2.2 Project Development: The A/E shall provide all services required to prepare documents and reports for the subject project consistent with the VA's project team goals as prioritized during preliminary project meetings, field surveys and studies. The A/E shall determine existing conditions, severity of deficiencies, if any previous deficiencies have been corrected and to identify any conditions which may have previously been unreported. Cost estimates shall be prepared to reflect the cost of replacing the component in a standalone project (i.e., not as part of another project) and all cost for this replacement including but not limited to asbestos removal, required phasing, special field conditions and/or temporary equipment needed during the construction. The completed report shall then be submitted for approval to the Contracting Officer's Representative (COR). 2.3 Project Design: Based on the approved design development the A/E shall provide all services required to prepare plans, specifications, and other supporting documents necessary to correct the identified deficiencies in priority order. The approved cost estimate and available project funding will be used to determine the amount of deficiencies which will be corrected under this project. A complete design including but not limited to determination and evaluation of existing conditions, necessary engineering calculation, necessary design work, IH Services, quantity and cost estimates, bid schedule, construction cost estimates, a proposed construction schedule, design analyses and heat loss calculations, a design documentation report, engineering considerations and options report shall be developed for this project. 2.4 Asbestos: The proper identification Asbestos to determine construction costs associated with Comprehensive Strategy & Report phase of this project are considered part of this project. To extent possible existing Asbestos Assessment of the facility will be made available to the A/E. Additionally proper asbestos abatement design and IH monitoring services required during construction to correct the deficiencies selected for the construction design portion of this project shall also be provided by the A/E. All A/E staff and subcontractors must have 16 hours of asbestos training to enter crawlspaces. Project Design Schedule Facility: ENRM Veterans Hospital Bedford MA Firm: Project Title: Building 3 Renovation Project Number: 518-22-109 Notice to Proceed: Contract: Duration: 35 Weeks The method of contractor selection has not been determined at this time.

Design

Medical

$1,617,149.00

Public - Federal

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
148
Bidding Soon
2,878
All Active Projects
1,178
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2023

img_map_placeholder

200 Springs Rd, Bedford, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.