EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 14, 2022 at 8:00 PM

Updated October 1, 2024

Site work and asbestos abatement for an educational facility in Moline, Illinois. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

As of 03/14/2022 This project has been awarded to Iowa-Illinois Taylor Insulation, Phase 1 will start on March 21, 2022 and will and on June 1, 2022. and Phase 2 will start on June March 25, which will end on June 17. Asbestos Abatements for Butterworth and Jane Addams Elementary Schools Locations - Butterworth Elementary School - 4205 48th Streeet, Moline, Illinois 61625 Jane Addams Elementary School - 3520 53rd Street, Moline, Illinois Bid security in the form of a bid bond, certified check or cash in an amount equal to 5 percent of the base bid amount shall be submitted with the bid. Should a bid bond be submitted, the bid bond shall be payable to the Board of Education, Moline-Coal Valley School District No. 40. Bids shall be submitted on or before the specified closing time in an opaque, sealed envelope. The Board of Education reserves the right to reject any or all bids or parts thereof, or waive any irregularities or informalities, and to make the award in the best interest of the District. All bidders must comply with applicable Illinois law requiring the payment of prevailing wages by all contractors working on public works. Bidder must comply with the Illinois statutory requirements regarding labor, including Equal Employment Opportunity laws.

Award

Educational

$35,500.00

Public - City

Asbestos Abatement, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Construction Facilities, Sanitary Facilities, Temporary Construction, Temporary Barriers and Enclosures, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Windows, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
72
Bidding Soon
722
All Active Projects
364
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2022

March 21, 2022

img_map_placeholder

Multiple Locations, Moline, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Asbestos Abatements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.