BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Flagler Beach, Florida. Completed plans call for the renovation of a clubhouse / community center.

As of February 7, 2022, the project was awarded to AWS Roofing. Bid amount received is $83,830.83. Pre-Bid Questions Due: Monday, January 24, 2022 5:00 pm The project consists of site mobilization and demobilization; removal of existing roof material down to the existing wood decks of the main building and the lower walkway roofs. Project also includes replacement of wood decks, replace all metal drip edges and flashing, replace fascia boards, replace perforated metal soffits, remove the existing brick chimney and patch opening and other miscellaneous items. See plans for all specifications and details. Upon award, the successful bidder will also be required to furnish and pay for satisfactory contract one hundred percent (100%) Performance and Construction Bonds to be recorded by the bidder, with the Clerk of the Court, Flagler County, Florida and to enter into a contract for services with the City of Flagler Beach. No bids received after the time and date specified for the opening will be considered. The City of Flagler Beach, Florida reserves the right to reject any and all bids, to waive any and all non-substantial irregularity in bids received, whenever such waiver or rejection is in the best interest of the City. All questions relative to an interpretation of specifications or the bid process may be submitted by email to: poverstreet@cityofflaglerbeach.com. Include the bid number in the subject line. The project consists of removal of all trim work (salvage to be reused as is practical); removal of twenty-five single hung windows and their movement mechanisms; removal of 1 set of exterior double doors; two single doors; 2 sidelights; 2 transoms. Replace all the above with equal number of doors, sidelights and transoms with impactresistant, low E glazing; add all blocking and shims necessary to fit components into the existing rough openings; replace all trim material that was salvaged in the demolition or replace with treated wood (exterior) and Grade C select pine (interior) at sizes to match existing; repair interior and exterior plaster where damaged by demolition or installation; paint all new surfaces to match existing; and all other incidental work as shown on the Drawings and as specified herein

Award

Elderly Care / Assisted Living

$83,831.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
119
Bidding Soon
2,085
All Active Projects
812
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 1, 2022

February 21, 2022

March 21, 2022

img_map_placeholder

800 S Daytona Ave, Flagler Beach, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.