BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2023 at 7:00 PM

Updated January 26, 2024

Site work and renovation of a swimming pool in Wenatchee, Washington. Completed plans call for site work for a swimming pool; and for the renovation of a swimming pool.

Renovations and upgrades to the existing Wenatchee City Pool. Upgrades include a new plaster liner with a painted finish at the gutter edge. All tile and other markings shall be updated, and joints repaired. Additional work includes replacement of the below pool distribution piping and main drain replacement. Additive Alternate: Replace the under-deck pool piping. Option #1: Provide an internal lining of the pipes. Option #2: Replace the pipes, including replacing the pool decks for access. Question Deadline 09/27/2022

Award

Swimming Pools

$1,790,900.00

Public - City

Renovation, Site Work

17

14

4

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
8
Bidding Soon
315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2022

November 2, 2022

Project location map

220 Fuller St, Wenatchee, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.