EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 5, 2022 at 7:00 PM

Updated October 1, 2024

Site work and paving for a transportation facility in Cody, Wyoming. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Schedule 1 - Runway 4 MALSF Schedule 2 - Runway 22 MALSF Bid Alternate 1 - Runway 22 MALSR Bid Alternate 2 - FAA Grounding This work is to include all tools, equipment, materials and labor to complete this project. Funding for This Contract is Federally Assisted. Contractors at every tier must comply with applicable federal requirements including but not limited to: the Buy American Preference, Foreign Trade Restriction, Davis Bacon, Affirmative Action, Government wide Debarment and Suspension, Government wide Requirements for Drug-free Workplace, as contained in the bid documents. Title VI Solicitation Notice. The Yellowstone Regional Airport, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Davis Bacon. The Contractor will be required to comply with the wage and labor requirements and to pay minimum wages in accordance with the schedule of wage rates established by the United States Department of Labor as referenced in the Contract. Non-Segregated Facilities. The Bidder is required to submit a Certification of Non-segregated Facilities (included in the Proposal form). Equal Employment Opportunity and Affirmative Action Requirement. The proposed contract is under subject to 41 CFR 60-1.4 and Executive Order 11246 of September 24, 1965, and to the Equal Employment Opportunity (EEO) and Federal Labor Provisions. A Contractor having 50 or more employees and his subcontractors having 50 or more employees and who may be awarded a subcontract of $50,000 or more will be required to maintain an affirmative action program, the standards for which are contained in the specifications. To be eligible for award each bidder must comply with the affirmative action requirements which are contained in these specifications. DBE Requirement. The Yellowstone Regional Airport Board has established an overall DBE goal for the year. Under this contract, the Airport Board is adopting a race-neutral means of facilitating DBE participation. The bidder shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The bidder shall carry out all applicable requirements of 49 CFR Part 26 in the award and administration of DOT assisted contracts As required by 49 CFR Part 26, the Yellowstone Regional Airport Board is required to create a bidders list, consisting of information about all DBE and non-DBE firms that bid or quote on DOT-assisted contracts. The purpose of this requirement is to allow use of the bidders' list approach to calculating future overall DBE goals. As per the requirements of the Proposal section, all Prime Bidders submitting bids on this project must submit, with his or her bid, a list including the name, address, and DBE/non-DBE status of all subcontractors and suppliers that bid or quote for work under this contract. Failure to provide this information, as outlined in the Proposal section, will make the bidder non-responsive and not eligible for award of the contract. Funding and Award. This contract will be funded in part by grants from the Federal Aviation Administration, (FAA) and Wyoming Department of Transportation--Aeronautics Division (WYDOT). Therefore, award of the Contract by the Sponsor will be made subject to concurrence of the FAA and WYDOT. Bidders may not withdraw Proposals for a period of ninety (90) days after the bid opening date. website "www.m-m.net", by clicking on the "Projects Bidding" tab, then "click here" and selecting this project from the project list. Documents can only be viewed on the Morrison-Maierle, Inc. website, and cannot be downloaded or printed without purchasing. To purchase and download the project documents in pdf format and be placed on the plan holder's list, click "Download Project PDF" and sign on to QuestCDN.com and join for a free membership. Plan documents and "Bid Proposal Packet" can be downloaded for a fee of $30.00. Please contact QuestCDN at 952-233-1632 or email "info@questcdn.com" for assistance in the free membership registration, downloading, and working with this digital project information.

Post-Bid

Transportation Terminals

$200,000.00

Public - City

Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Watering, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Batching Equipment, Mixers, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
3
Bidding Soon
27
All Active Projects
13
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Runway 4-22 Approach Lighting Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.