Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 24, 2025 at 7:00 PM
Updated November 25, 2025
Site work, paving and outdoor lighting for a mixed-use development in Ankeny, Iowa. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
The SE Creekview Drive Extension - North of SE Oralabor Road project includes extending SE Creekview Drive from approximately 2,500 feet north of SE Oralabor Road to approximately 3,700 feet north of SE Oralabor Road as a two-lane urban roadway section. The construction improvements include approximately 4,158 SY of 9" thick PCC Class C-SUD street pavement, 329 LF of water main, 1,331 LF of storm sewer, 2,356 LF of subdrain, Class 10 excavation, subgrade preparation, modified subbase, sidewalks, pavement markings, traffic signs, temporary traffic control, erosion control, final surface restoration, and miscellaneous associated work necessary to complete the project. The Contractor shall substantially complete the overall project within eighty (80) working days. Substantial completion for the overall project shall be defined as all utility, grading, and pavement construction completed, with the new pavement markings and signs installed, and the new street and sidewalks fully open to traffic. Should the Contractor fail to substantially complete the work in this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The Contractor shall fully complete the overall project within ten (10) working days commencing on a mutually agreed upon date following substantial completion of the overall project. Full completion for the overall project shall be defined as all work including temporary surface restoration and punch list items completed, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work in this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s). Est. Value: $ 1,628,000.00
Under Construction
Roads / Highways
$1,180,130.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2025
November 4, 2025
SE Creekview Dr, Ankeny, IA
Related To This Project
Ankeny, IA
Bid Date: Feb 11 2025
Ankeny, IA
Bid Date: Feb 13 2024
Ankeny, IA
Bid Date: Apr 09 2024
Ankeny, IA
Bid Date: Jan 28 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
