Published August 22, 2023 at 8:00 PM
Updated January 26, 2024
Site work, paving and outdoor lighting for a civil project in Ankeny, Iowa. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; and water / sewer project.
Reconstruction of West 1st Street from just east of NW Greenwood Street to just west of State Street. The existing four-lane street is only 41' wide (four - 10' lanes) and is proposed to be removed and replaced with a new five-lane street that is a minimum of 60' wide (four - 11' lanes with 2' curb and gutter sections along with a 12' center two-way left-turn lane). Additional improvements include sanitary/water/storm upgrades to replace the 50-year-old underground infrastructure; the addition of a new traffic signal at the West 1st Street and Linden Street intersection; and the addition of approximately 20 streetlights. Similar to the West 1st Street Widening and Improvements - Phase 1 project currently under construction in 2021 and 2022, it is anticipated that a joint utility trench will be necessary. Along with City/School fiber and other private utilities, it is assumed the existing overhead electric on the wood poles would be placed underground in the joint utility trench. The Public Works Department is proposing that the Phase 2 project's construction be scheduled for 2026 and 2027, with the joint utility trench construction in 2025. For the purposes of this initial Capital Project Request Form, it is estimated that the overall construction cost for the Phase 2 project is approximately $7 million, divided equally over two years. The estimate for the joint utility trench project is approximately $1 million. This project is included in the city's 2022-2026 Capital Improvement Plan (CIP). As of December 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available
Conceptual
Roads / Highways
$4,500,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
W 1st St, Ankeny, IA
Related To This Project
Ankeny, IA
Bid Date: Oct 14 2025
Ankeny, IA
Bid Date: Feb 11 2025
Ankeny, IA
Bid Date: Apr 09 2024
Ankeny, IA
Bid Date: Jan 28 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.