BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 24, 2025 at 7:00 PM

Updated November 25, 2025

Site work, paving and outdoor lighting for a mixed-use development in Ankeny, Iowa. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

The SE Creekview Drive Extension - North of SE Oralabor Road project includes extending SE Creekview Drive from approximately 2,500 feet north of SE Oralabor Road to approximately 3,700 feet north of SE Oralabor Road as a two-lane urban roadway section. The construction improvements include approximately 4,158 SY of 9" thick PCC Class C-SUD street pavement, 329 LF of water main, 1,331 LF of storm sewer, 2,356 LF of subdrain, Class 10 excavation, subgrade preparation, modified subbase, sidewalks, pavement markings, traffic signs, temporary traffic control, erosion control, final surface restoration, and miscellaneous associated work necessary to complete the project. The Contractor shall substantially complete the overall project within eighty (80) working days. Substantial completion for the overall project shall be defined as all utility, grading, and pavement construction completed, with the new pavement markings and signs installed, and the new street and sidewalks fully open to traffic. Should the Contractor fail to substantially complete the work in this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The Contractor shall fully complete the overall project within ten (10) working days commencing on a mutually agreed upon date following substantial completion of the overall project. Full completion for the overall project shall be defined as all work including temporary surface restoration and punch list items completed, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work in this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s). Est. Value: $ 1,628,000.00

Under Construction

Roads / Highways

$1,180,130.00

Public - City

Outdoor Lighting, Paving, Site Work

31

8

5

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
104
Bidding Soon
1,160
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2025

November 4, 2025

Project location map

SE Creekview Dr, Ankeny, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.