Site work and paving for a civil project in Ankeny, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; and bridge / tunnel.

The NW 36th Street and NW Weigel Drive HMA Resurfacing project includes subgrade preparation and Hot Mix Asphalt (HMA) overlay of NW 36th Street from NW Weigel Drive to NW Irvinedale Drive and subgrade preparation and HMA overlay of NW Weigel Drive from NW 18th Street to NW 36th Street. The construction improvements include approximately 12,600 Tons of HMA, subgrade preparation, storm sewer culvert extensions, pavement markings, permanent signage, Class 10 excavation, temporary traffic control, erosion control, final surface restoration, and miscellaneous associated work necessary to complete the project. Each Bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful Bidder will enter into a Contract for the work bid upon and will furnish after the award of Contract a corporate Surety Bond, in a form acceptable to the City of Ankeny, for the faithful performance of the Contract, in an amount equal to one hundred percent (100%) of the amount of the Contract. Each successful Bidder will be required to furnish a corporate Surety Bond in an amount equal to one hundred percent (100%) of its Contract price. Said Bond shall be issued by a responsible Surety approved by the City of Ankeny and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the City of Ankeny from claims and damages of any kind caused by the operations of the Contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of four (4) years from and after acceptance of the Contract. NW 36th Street and NW Weigel Drive HMA Resurfacing -- $2,175,000 The Contractor shall substantially complete the overall project within fifty (50) working days. Substantial completion for the overall project shall be defined as all utility, grading, and pavement construction completed, with the new pavement markings and signs installed, and the new streets fully open to traffic. A mandatory six-day work week is not required; however, working days will be charged on Saturdays if the Contractor elects to perform bid item work on Saturdays. Should the Contractor fail to substantially complete the work in this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The City of Ankeny does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City.

Award

Roads / Highways

$1,691,525.00

Public - City

Paving, Site Work

5

12

8

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
45
Bidding Soon
469
All Active Projects
256
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

April 15, 2024

img_map_placeholder

Multiple Locations, Ankeny, IA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.