Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 24, 2022 at 7:00 PM

Updated November 14, 2023

Renovation of a library in Bisbee, Arizona. Completed plans call for the renovation of a library.

Manufacturing and Installing 4th Rail on Both the Second and Third Floor Balconies of the Copper Queen Library Building at 6 Main Street 4th Rail Must Match the Size and Look of the Existing 3 Rails (3" Pipe) Must Include Wall Plates for the Pipes. Wall Plates Must Match the Size and Look of the Existing Wall Plates Areas Where the Block Is Uneven Must Be Cut to Inset Wall Plates Bid Must Include All Cost for Materials, Any Fabrication That Must Be Done, and Installation of All Rails

Post-Bid

Library

$15,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
19
Bidding Soon
238
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2022

March 7, 2022

Project location map

6 Main St, Bisbee, AZ

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed