BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling and renovation of a medical facility in Mobile, Alabama. Completed plans call for the remodel of a medical facility.

TASK ORDER REQUEST FOR PROPOSAL NO. PNUM 13445264 ACUTE CARE & ISOLATION ROOM MEDICAL CLINIC AT U.S. COAST GUARD AVIATION TRAINING CENTER MOBILE, ALABAMA Building S24 is a single-story building of masonry construction with a built-up roof system over a metal deck and steel frame construction. The original building was constructed in 1968 with an addition of the dental clinic and pharmacy completed in 2004. The complete facility is approximately 12,500 square feet. The proposed work is directed only to the emergency room. The work will replace two (2) fan coil units, with a small footprint vertically stacked unit and a slim profile ceiling mounted unit. Work will also replace lighting and power within the room, all casework with new medical grade casework and sink, and reconfigure the room into two (2) patient rooms to match existing facility examination rooms.. Goals for Minority Participation for Each Trade 25.9% Goals for Female Participation for Each Trade 6.9% Magnitude of Construction is between $100,000.00 and $250,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. complete the entire work ready for use not later than 120 calendar days

Post-Bid

Medical

$250,000.00

Public - Federal

Remodeling, Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
33
Bidding Soon
490
All Active Projects
230
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

March 14, 2022

img_map_placeholder

8501 Tanner Williams Rd, Mobile, AL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.