Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 11, 2022 at 7:00 PM

Updated January 29, 2024

Renovation of a mixed-use development in Everett, Washington. Completed plans call for the renovation of a educational facility; and water / sewer project.

Everett School District No. 2 reserves the right, as described in the Instructions to Bidders, to postpone the Bid. opening, to waive informalities or irregularities in the bid process, and to reject any or all Bids. Replace boilers in the Whittier Elementary School. The project will include new boilers, new hydronic pumps with new variable frequency drives, a new expansion tank as well as adding manual air bleeds and bypass loops in the heating water system. Boilers are to have communication cards and. tie into the existing DDC system.

Post-Bid

Educational

$390,000.00

Public - City

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
295
Active Projects
134
Bidding Soon
2,238
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed