BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Maryville, Tennessee. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Contract A Eastover Lift Station Rehabilitation and Contract B Wildwood Lift Station Rehabilitation Bids will be accepted from contractors who are registered plan holders, obtaining the Contract Documents from the Issuing Office, only. Bid Security in the amount of five percent (5%) of the amount of the Bid must accompany each Bid. No bid may be withdrawn within sixty (60) days after the scheduled closing time for receipt of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities in the Bids, and to determine the lowest responsible Bidder. The Owner reserves the right to award the Contract(s) as two (2) separate contracts, or as a single contract. All Bidders must be licensed Contractors as required by the Contractor's Licensing Act of 1976 (latest revision). Bidder's name, license number, expiration date and that part of classification which applies must be on the sealed envelope containing the executed Bid Proposal. Subcontractor's information, where applicable, must also be included on the sealed envelope. Electrical, plumbing, masonry and, HVAC subcontractors with an interest in the Bid must be listed on the envelope. If no electrical, plumbing, masonry or HVAC subcontractors will be utilized, note these as "Not Applicable". Contractors must comply with all Drug Free Workplace Requirements. The work in general consists of the construction of approximately the following quantities: Contract "A" 1. Demolition of access hatch, fence, yard piping, and valve vault. 2. One new solids handling pump to match existing. 3. New precast concrete valve vault with two check valves, two ARV's, and two plug valves. 4. Coating of existing wet well with Spectra Shield. 5. Site yard piping and fencing. 6. Erosion and sediment control. 7. All mechanical, electrical, and instrumentation required for a complete, functional installation. Contract "B" 1. Demolition of wet well, fence, yard piping, and valve vault. 2. Two new sewage grinder pumps. 3. New precast concrete wet well. 4. New valve vault with two check valves, two ARV's, two plug valves, and a bypass connection. 5. Site yard piping and fencing. 6. Erosion and sediment control. 7. All mechanical, electrical, and instrumentation required for a complete, functional installation. The allotted time for construction is 210 calendar days.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Renovation, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
19
Bidding Soon
485
All Active Projects
221
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2022

March 21, 2022

img_map_placeholder

Multiple Locations, Maryville, TN

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.