BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 22, 2022 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Sunol, California. Contact the soliciting agency for additional information.

Contractor agrees to provide to the California Department of Transportation (Caltrans), all labor, tools, materials, equipment, parts, travel, and incidentals necessary to provide emergency and routine identification and removal of hazardous wastes and/or materials (including but not limited to: underground tanks, containers, drums pipes, appurtenances, chemicals, hazardous substances, spilled materials, contaminated surfaces, contaminated water, contaminated soil, or other subsurface or above grade structures and materials) discovered within the limits of the State right of way during the term of this Agreement, as described herein. The scope of work specifically does not include identification and removal of hazardous waste and/or materials caused by or generated at vehicular collisions, accidents, and highway spills. A. Questions regarding this IFB must be submitted in writing by February 4, 2022. Bidders are encouraged to submit their written questions via e-mail to Robert.Carothers@dot.ca.gov. B. Written questions must include: the individual's name, firm name, complete address and must reference IFB No. 04A6293. Questions must be sent to one of the following: Email: Robert.Carothers@dot.ca.gov Or mail to California Department of Transportation (Caltrans) Division of Procurement and Contracts Attention: Robert Carothers 1727 30th Street, MS 65 Sacramento, CA 95816 C. Written responses to all questions will be collectively compiled and posted, as an Addendum, to the Cal eProcure website (https://caleprocure.com/pages/index.aspx). It is the responsibility of the Bidder to access the website for any changes or addenda that may be posted. Refer to this IFB, Section C1, Time Schedule, for the schedule of events and dates/times. It is the responsibility of the bidder to check Cal eProcure for all addenda. Bidder can contact the Contract Analyst named above.

Bid Results

Roads / Highways

$2,941,738.00

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
534
Active Projects
213
Bidding Soon
3,228
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2022

June 1, 2022

Project location map

Multiple Locations, Sunol, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.