BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a civil project in Sunol, California. Completed plans call for the renovation of a water / sewer project.

**As of February 13, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Project Description ****SFPUC Upcoming Contracting Opportunity**** The San Francisco Public Utilities Commission (SFPUC) will advertise a construction contract, WD-2897 Sunol Valley Water Treatment Plant Ozonation. The SFPUC is actively working on the advertisement and has set a goal to advertise by mid-July 2023, possibly sooner. Project Description The scope of this project is to install a raw water ozonation system including the following major components: 10-inch through 66-inch diameter piping, elbows and valves; Concrete valve vaults; Ozone Generator Building; Electrical Building; Loop Cooling Water Systems; Cryogenic Oxygen Tank Systems; Liquid Oxygen Vaporizer Systems; Ozone Generators; Ozone Injector Systems; Ozone Contact Basin; Ozone Destruct Systems; Pre-chlorination Facilities for Bromate Control Instrumentation & Controls; Shop Space; Solar Panels; Standby Power Systems; High Voltage & Low Voltage Electrical Eq. & Distribution Systems; Underground Utilities; and Site Improvements. Engineer's Estimate is $183M Important Dates Substantial Completion - 1,522 calendar days from NTP Final Completion - 90 calendar days after Substantial Completion A breakdown of 3.1% MBE, 2.4% WBE, and 2.5% OBE reflects the diversity of San Francisco Micro- and Small-LBEs. The breakdown is provided for informational purposes only. Bidders are further advised that they may not discriminate in the selection of subcontractors on the basis of race, gender, or any other basis prohibited by law, and that they shall undertake all required good faith steps in such a manner as to ensure that neither Minority Business Enterprises ("MBE") nor Women Business Enterprises ("WBE") nor Other Business Enterprises ("OBE") are unfairly or arbitrarily excluded from the required good faith efforts."

Award

Water / Sewer

$9,348,500.00

Public - County

Renovation

6

43

19

21

Subscribe For Documents

101 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
86
Bidding Soon
1,841
All Active Projects
781
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2024

March 11, 2024

img_map_placeholder

8653 Calaveras Rd, Sunol, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.