Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published March 2, 2022 at 7:00 PM
Updated November 16, 2023
Site work and new construction of a playground / park / athletic field in Ayer, Massachusetts. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.
Norton Field Concessions Building as indicated on the Drawings and Project Manual. General Bid Deadline: 2/17/22 ,Time: 2:30 P.M. for GC projects The work of the Contract includes construction of a new support structure containing public toilets and concessions and a new ticket booth. Estimated Construction Cost: $700,000 The proposed project is the complete renovation of the existing track and natural grass field. Work shall include the following: a. A new 400 meter (6 lane oval - 8 lane straight) bituminous concrete pa pavement running track with resilient track surfacing; b. an infilled synthetic turf infield; c. baseball outfield renovations: d. associated site improvements (bleacher, press box, sports lighting, athletic equipment, walkways, etc.) as illustrated and defined in the drawings and specifications. Contractor Mobilization: It is anticipated that the Contractor may mobilize to the site on or before Monday, April 4, 2022. Track and Field Substantial Completion: The Contractor shall achieve Substantial Completion of the track and field on Friday, August 12, 2022 at 5:00p.m. Final Completion: The Contractor shall achieve Final Completion on Friday, August 26, 2022 at 5:00p.m.
Bid Results
Playgrounds / Parks / Athletic Fields
$611,653.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 15, 2022
April 4, 2022
141 Washington St, Ayer, MA
Related To This Project
Ayer, MA
Bid Date: Feb 15 2022
Ayer, MA
Bid Date: Feb 24 2022
Ayer, MA
Bid Date: Feb 03 2022
Ayer, MA
Bid Date: Feb 25 2022
Ayer, MA
Bid Date: Mar 24 2022
Ayer, MA
Bid Date: May 18 2023
Ayer, MA
Bid Date: Oct 13 2023
Ayer, MA
Bid Date: Feb 10 2022
Ayer, MA
Bid Date: Feb 16 2022
Ayer, MA
Bid Date: Jul 01 2021
Ayer, MA
Bid Date: Sep 13 2023
Ayer, MA
Bid Date: Oct 25 2023
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed