BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 25, 2022 at 7:00 PM

Updated November 15, 2023

Demolition, site work, renovation and addition to a water / sewer project in Ayer, Massachusetts. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

Ayer WWTF FY2020 Improvements - project includes the addition of a new GBT, polymer and wash water systems; rehab. of existing sludge storage tanks; new solids pumps and aeration, new plant water system, and HVAC, instrumentation, and electrical improvements. Contractor Qualification DCAMM Certificate The project includes the addition of a new 2.0-meter-wide gravity belt thickener, polymer system, and wash water system; rehabilitation of existing sludge storage tanks; replacement of existing RAS and primary sludge pumps; addition of blower and aeration system for sludge aeration; addition of new thickened sludge pumps, sludge offloading control improvements, and new plant water system; as well as HVAC, instrumentation, and electrical improvements. A deposit of $100.00 in cash, bank or certified check payable to the Town of Ayer, Massachusetts will be required for each set of the Contract Documents. Up to two complete sets of Contract Documents will be available to General Bidders and one complete set for each filed sub-bidder. A refund of the deposit will be made for such Documents returned in good condition within 30 days after the Bids are received. Additional sets may be purchased by bidders.

Award

Water / Sewer

$2,489,890.00

Public - City

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
610
Active Projects
260
Bidding Soon
4,191
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2021

August 30, 2021

Project location map

Brook St, Ayer, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.